CLiPtec

CliPtec Heavy Duty Micro USB Charging Cable Braided Fast Phone Charger Long Lead 1m - Green

Best price from 1 retailer
£0.99
Brand
CLiPtec
Category
Storage & Data Transfer Cables
GTIN / Barcode
9555440817103
MPN
CLP971
Brand CLiPtec OCC103 USB2.0 Metal ended Nylon Braided Micro USB Cable is a durable, high quality precision finish and high speed connection that harnesses the full capability of the USB 2.0 standard data transfer speed and power charging your device. Ideal for syncing data and charging the latest Smartphones, tablets, MP3 players, mobile phones, PDA's, digital cameras.FeaturesData transmission and charge for phone of Micro USB cable.Support Hot-plug and Plug 'n' play.Gold plated for optimum connectivity.Able to support sync and power.SpecificationsCable Type USB 2.0 CableConnectors Type USB A-Male to Micro-BCable Length 1.0 m Braided CableCable Jacket Material Metal/TPECable O.D. 3.5 mm

Price Comparison — 1 Offer

Retailer Price Condition Availability
Bo
Boxed2me
£0.99 Lowest New
In Stock
View Deal

ℹ Prices are updated when feeds are imported. Always verify the final price on the retailer's website before purchasing.